Changes

Jump to navigation Jump to search

Guides:Guides/FlatRaising

250 bytes added, 10:39, 15 March 2022
Adding disclaimer, removing obsolete directory listing
[[CDB|Main]] / [[:Category:Guides|Guides]] / '''{{PAGENAMEguide}}''' 
==Tich's Art of FlatRaising==
===Definition===
FlatRaising Flatraising is a term used to describe the way to get slopes process of making [[slope]]s greater than 40 dirt dirts (4 meters).  ===Why it is used===
It is used because dirt ===Purpose===Dirt "flows" when a slope gets to 40 dirts (4 meters), what i mean by . "FlowFlowing" is means that the dirt will slide down the slope until it gets to a lesser slope(less than 40). Dirt will also flow if the diagonal slope of the tile is over 40 dirts (4 meters).
How to tell what ===Measurement===To find out how many dirts (how steep) a slope is.. Well , examine the Tile tile border, but dirt . A [[digging]] skill of 15 or better will also flow if the diagonal allow a "mouseover" examination of the tile border when a shovel is over 4 meter slope as wellactivated.
===Restrictions===
The largest slope you can make is three times 3x your skill. ===How to do it===#For this example i will assume that you start with a 4x4 (totally) flat area and want to raise the middle 2x2 area up high.#First drop 40 dirt on each corner of the 2x2 area. #Once the outer slopes are 40 dirt, start dropping dirt (batches of 10-20 dirt is good) in the center of the 2x2.#Flatten one of the tiles (rotating the tile to flatten is a good idea, if not you had better flatten all the 4 tiles). Remember not to stand on the high point when flattening as you will get "Ouches".#Repeat until either you get the "Spire" to your desired height or to your skill height. http://i112.photobucket.com/albums/n191/psofimia/FlatRaising.png
===NotesMethod===Another option ''For this example I will assume that you're starting with a 4x4 (completely flat) area and want to flatraise the middle 2x2 area.''# Drop 40 dirts on each exterior corner of the 2x2 area. # Once the exterior corners are raised 40 dirts, start dropping dirt (batches of 10-20 dirt is to dig at typical) in the center of the base 2x2 area.# [[Flattening|Flatten]] one of a slope the tiles (rotating the tile to increase it, but this flatten is a good idea; if not always possible (eyou had better flatten all the 4 tiles).g''Remember not to stand on the high point when flattening as you will get [[wound|"ouchies"]]. on landbridges ''# Repeat until you get the "spire" to your desired height or when doing a road along rock)to the maximum height for your skill level.
===Tips===* Note that once the [[Image:FlatRaising.png|center|460px|The largest slope gets over 20 dirt, to get up/down from this 2x2 area will not be easy because you may need to climbcan make is three times your skill. ]]
* A good advice ===Variation===Another option is to make dig at the base of a pile for the dirt (using any object on youslope to increase it, its easier with different items as but this will form a "pile of items", which is easier to target) not always possible (e.g. on the slope and then add the dirt (from your cartlandbridges or when building a [[road]] along rock), and retrieve your items, repeat until your pile(s) have 100 dirt so you don't have to keep climbing up/down.
===Tip===
* Once the slope gets over 29 dirts, you will have [[Climbing|climb]] to get up and down from the 2x2 area. To save time, use this method to prevent you from having to climb up and down the slope as you work: drop items you have in your [[inventory]] (easier with four different items) until you form a "[[pile of items]]" which is easy to target. Then add at least 2 dirts to the pile and remove your items. You may add up to 100 dirts to each pile (one pile per tile).
{{cleanup}}===Tutorial==={{copyedit}}[http://www.youtube.com/watch?v=k60abympbuU Flatraising with Slickshot]
[[Category:Guides]][[Category:Babel/F]]

Navigation menu