Difference between revisions of "Clad"
Jump to navigation
Jump to search
Line 47: | Line 47: | ||
− | + | ||
[[Category:Babel/P]] | [[Category:Babel/P]] |
Revision as of 02:22, 14 August 2017
Main / Structures / Walls / Clad
Description
Clad is the terminology given to the process of applying materials to an existing reinforced mine wall. This is used in a decorative or aesthetic purpose, and has no further reinforcement effect on the tile it is applied to.
Clad Options
Method
Removing clad
Paved tiles may be cultivated back to dirt by equipping a shovel and choosing 'Destroy pavement'. Body strength of 20 and a digging skill of 10 is required for destroying pavement. Destroying pavement gives digging skill and the length of time it takes to remove the pavement is also based on this digging.