Difference between revisions of "Thatched roof"

From Wurmpedia
Jump to navigation Jump to search
Line 21: Line 21:
 
* You need to have one thatch and one wire in inventory to start building the roof.
 
* You need to have one thatch and one wire in inventory to start building the roof.
 
* Can be repaired and improved with planks.
 
* Can be repaired and improved with planks.
* A roof located on top of the 1st story of a building, otherwise called the 1st-floor roof, is technically built on the 2nd story and so the chart below reflects this for accuracy. (Example:  a 1-story building has a roof, and that roof is located above the 1st floor on the 2nd story)
+
* A roof located on top of the 1st story of a building, otherwise called the 1st-floor roof, is technically built on the 2nd story and so the chart below reflects this for accuracy. (Example:  a 1-story building has a roof, and that roof is located above the 1st floor as the 2nd story)
  
 
==Skill Requirements==
 
==Skill Requirements==

Revision as of 23:04, 27 April 2014

Main / Skills / Thatching / Thatched roof Template:Roof

Description

Roof plan to create thatched roofs for your buildings.

Usage

  • Right click the floor of the house, select Roof
  • Right click the roof plan, select Build and Thatched roof

Notes

  • Requires 21 thatching skill to build.
  • You need to have one thatch and one wire in inventory to start building the roof.
  • Can be repaired and improved with planks.
  • A roof located on top of the 1st story of a building, otherwise called the 1st-floor roof, is technically built on the 2nd story and so the chart below reflects this for accuracy. (Example: a 1-story building has a roof, and that roof is located above the 1st floor as the 2nd story)

Skill Requirements

This section is a work in progress through recent experimentation. Please note the chart begins with the 2nd floor because the roof on top of the 1st floor is technically located on the 2nd floor.


Floor Thatching
2nd 21
3rd 23
4th 30
5th ?
6th ?
Floor Thatching
7th ?
8th ?
9th ?
10th ?
11th ?
Floor Thatching
12th ?
13th ?
14th ?
15th ?


Picture until uploaded

wurm201212140223_2.jpg

Total materials needed

  • 10x thatch
  • 10x wires (0.40kg)

Examine description: You see a roof under construction. The roof requires x bunches of thatch and x metal wires to be finished.